PEB Studio
Module highlight · Traceability

End-to-end traceability for every steel member

Follow every member from the mill certificate and the plate it was cut from, through fabrication, welding, inspection, painting and packing, to its place in the building. One signed QR code opens the complete history.

Built for: Quality managers, clients and auditors, building owners
End-to-end traceability for every steel member
LiveHeat no. 24-1187 · 3 members
LiveQR verified · signature valid
1 QRper member, signed and tamper-evident
100 %of events in an append-only history
Secondsto answer an auditor's question
Key capabilities

From mill certificate to installed member

01

Material and heat traceability

Mill certificates and heat numbers are linked to plates and sections and carried to every part cut from them.

02

Signed QR codes

Labels carry a cryptographic signature, so a copied or altered label is detected immediately.

03

Complete member timeline

Cutting, fit-up, welding, inspection, painting, packing, shipping and erection, with who, when, where and photos.

04

Welder and WPS traceability

Every weld is linked to the welder, the procedure, the consumables and the inspection result.

05

Append-only history

Records cannot be deleted or rewritten; corrections are added as new, visible entries.

06

Public verification page

Clients and inspectors scan the label and see a verified summary, without an account.

When a client, an auditor or an insurer asks where a member came from and who worked on it, the answer is one scan away.

Why it stands out

Traceability

Follow every member from the mill certificate and the plate it was cut from, through fabrication, welding, inspection, painting and packing, to its place in the building. One signed QR code opens the complete history.

Book a demo

Compliance with less effort

Traceability is a by-product of daily work, not an extra documentation project.

Faster root-cause analysis

Find every member affected by a material or welding issue in seconds.

Trust you can show

Signed data and verification pages prove quality to clients and authorities.

Value for the owner

The building keeps its digital record for maintenance, audits and future changes.

How it works

Traceability

  1. 1

    Mill certificates and materials are registered on arrival.

  2. 2

    Each part inherits its material data when it is cut.

  3. 3

    Every operation adds a signed event to the member's history.

  4. 4

    Anyone authorised scans the QR to see and verify the full story.

See your own model in PEB Studio

Send us an IFC export and we will walk your team through BOM, cutting plans, production tracking and packing on your project.